Skip to content

ALDOT News Hub

Bridge strike closes I-65 southbound in Shelby County

UPDATE: August 25, 7:35 p.m.

ALDOT has reopened I-65S at Exit 234 in Calera.

All southbound lanes were shut down for seven hours Tuesday following a bridge strike at the CR-87 bridge.

The southbound lane of the CR-87 bridge itself will remain closed for a few weeks until the damaged section can be repaired.


UPDATE:...Read More "Bridge strike closes I-65 southbound in Shelby County"

The Alabama Department of Transportation (ALDOT) is highlighting its regional engineers during National Engineers Week, which is about celebrating today’s achievements and paving the way for a brighter and more diverse future in engineering.

North Region Engineer Curtis Vincent joined ALDOT in 1988. Vincent served as a project engineer, design engineer, assistant division engineer in…

Read More “Curtis Vincent, North Region Engineer”

SR-101 at Big Nance Creek in Lawrence County.

Though snowfall across much of north Alabama caused few travel issues today, moisture remaining on pavements may refreeze, forming hazardous “black ice” overnight.

The Alabama Department of Transportation (ALDOT) advises motorists to drive slowly and cautiously.

As temperatures drop tonight, bridges are likely to experience icing first, but “black ice” concerns are not limited to…

Read More “Beware “black ice” on north Alabama highways tonight”

The Alabama Department of Transportation (ALDOT) is celebrating National Engineers Week by recognizing the dedicated regional engineers who work to ensure safe and efficient travel across the state.

In the Southeast Region, Josh Kervin is the youngest and newest region engineer, having assumed the role on Jan. 16, 2025.

Kervin earned a degree in civil…

Read More “Josh Kervin, Southeast Region Engineer”

The interchange of I-565 and Memorial Parkway in Huntsville during a previous snow event in January.

The Alabama Department of Transportation (ALDOT) is preparing for snow and sleet to reach parts of north and central Alabama on Wednesday morning.

ALDOT began pretreatment today of interstates, bridges, and mountainside roads and other routine problem areas in northern Alabama counties. Additional priority routes may be pretreated as time permits and depending on area…

Read More “ALDOT prepares for snow and sleet in north Alabama”

The Alabama Department of Transportation (ALDOT) continues to celebrate National Engineering week, which highlights the career achievements from Region Engineers.

Born in Greensboro, Hale County, Wallace McAdory III attended Southern Academy and graduated from the University of Alabama in 1984. He is a registered professional engineer and member of the American Society of Civil Engineers.

Read More “Wallace McAdory III, West Central Region Engineer”

An Alabama Department of Transportation project to install a continuous “Green T” signal at the intersection of US-31 and McQueen Smith Road in Prattville will begin, Wednesday, Feb. 19, weather permitting.

The project will also include resurfacing on US-31 from north of the Alabama River bridge to US-82.

The continuous “Green T” signal will give…

Read More “Traffic signal coming to US-31 and McQueen Smith Road in Prattville”

ALDOT conducts thorough inspections to assess bridge conditions and makes sure they’re in good shape for drivers.

The Alabama Department of Transportation (ALDOT) plays a vital role in ensuring the safety of the state’s bridges. ALDOT conducts thorough inspections to assess bridge conditions and makes sure they’re in good shape for drivers.

These inspections follow federal guidelines that outline rules for checking bridges on public roads. ALDOT also has the flexibility to…

Read More “How ALDOT keeps Alabama’s bridges safe”

Popular Stories