Skip to content
ALDOT News Hub
Map of the location of the resurfacing project in Baldwin County

The Alabama Department of Transportation (ALDOT) will begin a resurfacing project on a portion of US-98 in Baldwin County on Wednesday, Aug. 30.

The $3.8 million project will improve the roadway from SR-104 east to CR-32. Wiregrass Construction Company, Inc. is the contractor.

What to Expect: Nightly lane closures are from 7 p.m. to 6…Read More “Resurfacing project on US-98 in Barnwell begins August 30”

An Alabama Department of Transportation (ALDOT) resurfacing project on SR-223 in Pike County begins Monday, July 28, weather permitting.

The project will take place on SR-223 from US-29 to the Bullock County line.

This project includes resurfacing, shoulder widening and traffic stripe.    

Motorists should expect lane closures and reduced speed limits throughout the project….

Read More “SR-223 resurfacing project in Pike County begins next Monday”

Resurfacing of SR-133/Cox Creek Parkway will begin Sunday night. The project includes resurfacing through multiple intersections, including the intersection with Darby Drive.

Resurfacing of SR-133/Cox Creek Parkway in Florence will begin the evening of Sunday, July 27, weather permitting.

In the $1.4 million project, contractor Rogers Group will mill and resurface more than two miles of the corridor from US-72/Florence Boulevard to SR-17/Helton Drive.

Initial work will include milling at intersections, installing signal detection loops, and patching.

Read More “Resurfacing of SR-133/Cox Creek Parkway in Florence to start Sunday night”

An Alabama Department of Transportation (ALDOT) resurfacing project on US-29 in Macon County begins Monday, July 14, weather permitting.

The project will take place on US-29 from SR-186 to the Lee County Line.

This project includes resurfacing and traffic striping.   

Motorists should expect lane closures and reduced speed limits throughout the project. ALDOT urges…

Read More “US-29 resurfacing project in Macon County begins Monday”

The contractor has paved all through lanes on SR-67/Beltline Road between US-31 and Danville Road.

The resurfacing project on SR-67/Beltline Road in Decatur will soon advance to the next phase, resurfacing between Danville Road and SR-24/Gordon Terry Parkway.

With all through lanes of SR-67/Beltline Road between US-31/Sixth Avenue and Danville Road paved, Grayson Carter and Son Contracting may begin patching and milling the northern segment of the project.

Simultaneously, the…

Read More “SR-67 resurfacing in Decatur to advance to next phase”

An Alabama Department of Transportation (ALDOT) resurfacing project on SR-14 in Elmore County begins Monday, July 7, weather permitting.

The project will take place on SR-14 from Jackson Street in the town of Elmore to SR-212 in Wetumpka.

The project includes resurfacing, traffic striping, and guardrail installation at specific locations within the SR-14 project limits.

Read More “SR-14 resurfacing project in Elmore County begins Monday”

An upcoming paving project will resurface SR-291 in Gadsden. Most work will take place at night.

A $1.1 million paving project on SR-291 in Gadsden will begin next week, weather permitting.

The project includes milling and resurfacing the entirety of SR-291 from US-431/US-278 to SR-759, about one mile.

Motorists are advised to expect single-lane closures from 6 p.m. to 6 a.m. Sunday nights through Thursday nights once resurfacing operations begin. However,…

Read More “Nighttime paving project on SR-291 in Gadsden to start next week”

After closing the inside lane of I-65 southbound Saturday night, work proceeded around the clock to complete the repair as quickly as possible.

After working around the clock since Saturday night, contractors completed repairs to the bridge on Upper River Road over I-65 about 14 hours ahead of schedule. All lanes of I-65 are now open.

The girders of the Upper River Road bridge in Priceville were damaged April 29 when they were struck by a piece of equipment improperly…

Read More “Bridge repair completed; all lanes of I-65 now open”

The Alabama Department of Transportation resurfacing project on SR-106 in Butler and Crenshaw counties starts Wednesday, June 18, weather permitting.

The project will stretch for about 12.5 miles on SR-106, from McKenzie Grade Road to after the Patsaliga Creek Bridge. It includes resurfacing, shoulder widening, guardrail maintenance and installation, and roadway traffic markings.

Motorists should…

Read More “Resurfacing project on SR-106 in Butler and Crenshaw counties”