The Alabama Department of Transportation (ALDOT) plans to remove the abandoned L and N railroad bridge on US-11 near Chamblee Avenue northeast of Woodstock in Tuscaloosa County.
The project is expected to last until Summer 2025.
The Alabama Department of Transportation (ALDOT) plans to remove the abandoned L and N railroad bridge on US-11 near Chamblee Avenue northeast of Woodstock in Tuscaloosa County.
The project is expected to last until Summer 2025.
The Alabama Department of Transportation plans to resurface, install guardrail and place new traffic striping on a portion of SR-216 in Tuscaloosa County from the junction of SR-215 to the junction of Lock 17 Road in Brookwood to improve mobility and safety.
The Alabama Department of Transportation plans to resurface, install guardrail and place new traffic striping on a portion of US-43 in northern Tuscaloosa County from near Northside Road to the Fayette County line to improve mobility and safety.
ALDOT plans to fully rebuild a portion of US-11 at Middle Coaling Road and Ed Stephens Road in Coaling to improve mobility. The contractor will also install temporary portable traffic signals to help manage traffic flow and enhance safety.
ALDOT will feature its first major Rebuild Alabama Act project in Tuscaloosa County with a job that is expected to improve traffic flow and reduce congestion along US-82 (McFarland Boulevard) from Highway 69 to Rice Mine Road.
The 2.77-mile project will add a travel lane in each direction, provide better access management to businesses and…
The purpose of this project is to resurface and add lanes to the roadway to accommodate the ongoing industrial development in the area. The project will also improve traffic flow and enhance safety.
The project will take place on US-11 between from Daimler Benz Boulevard and the Highway 5 intersection (approximately seven miles). Significant growth…
Read More “US-11 widening project from Daimler Benz Blvd. to Highway 5”
The Alabama Department of Transportation plans to repair bridge decks and install new guardrail at various locations on Interstate 20/59 eastbound from near milepost 64 to near milepost 72 in Tuscaloosa.
The project is expected to begin Monday, January 8 and will continue until Summer 2024, weather permitting. The contractor must keep at least one…
Read More “Bridge deck repair, guardrail installation on I-20/59”
The Alabama Department of Transportation plans to replace and widen the US-11 (Skyland Boulevard East) bridge over Norfolk Southern Railroad near Clearview Hills Drive in Cottondale.
The new bridge will have one lane in each direction and a center-left turn lane. A sidewalk will also be installed on the east side of the bridge.